The final section of Twyckenham Blvd is under design. The proposed project will include reconstructed pavement, sidewalks, and trail as well as pedestrian trail crossing signals. Design will continue in 2017 &2018 with anticipated construction in 2019. The project is funded with 80% federal funds and 20% local funds.